Terms and Conditions
These Terms and Conditions (T&Cs) govern the sale of web development services offered by Accura.dev. Any order implies unreserved acceptance of these T&Cs.
1. Purpose and scope
These terms apply to all services offered by Accura.dev, namely:
- MCP server audit
- MCP server migration to a specification revision
- Design and development of production MCP servers
- Preparation and submission of a connector directory package
- Compliance monitoring and maintenance
2. Services offered
2.1 MCP audit (EUR 950)
Includes:
- Full diff of the server against the 2026-07-28 specification
- Inventory of breakages and their severity
- Tool annotation review
- OAuth and RFC 9728 metadata review
- Prioritised and costed migration plan, delivered in writing
Delivery time: 2 business days
2.2 2026-07-28 migration sprint (EUR 2,400)
Includes:
- The audit described in 2.1
- Move of the core to stateless
- Header and error code compliance
- Replacement of long-lived SSE flows with Multi Round-Trip
- OAuth hardening
- Validation against the major MCP clients
- Go-live
Delivery time: 5 business days
2.3 Production MCP server (EUR 4,500 to 7,500)
Includes:
- Tool set, naming and schema design
- readOnlyHint and destructiveHint annotations
- OAuth 2.1, quotas and per-plan gating
- Write audit log
- Deployment, observability and go-live
Delivery time: 2 to 3 weeks
2.4 Directory package, monitoring and custom projects
The Anthropic directory package is offered at a fixed fee of EUR 1,200. Compliance monitoring is offered at EUR 290 per month with no minimum term. Any other scope is quoted against a written specification.
3. Order and acceptance
The order becomes firm and final upon:
- Acceptance of the signed quote (electronically or handwritten)
- Receipt of the deposit payment (minimum 30%)
- Provision of the complete brief
A confirmation email will be sent within 24 hours.
4. Prices and payment terms
4.1 Prices
Prices are quoted in euros (€), excluding VAT for professionals and inclusive of all taxes (TTC) for individuals.
The displayed prices are firm and non-revisable during the duration of the project, except in the event of a substantial modification of the specifications.
4.2 Payment terms
- Deposit: 30% upon order
- Interim payment: 40% mid-project (if applicable)
- Balance: 30% upon delivery
Accepted payment methods: bank transfer, bank card (via Stripe/Polar).
4.3 Late payment
In the event of late payment, penalties equal to three times the legal interest rate will be applied, as well as a fixed indemnity of €40 for collection costs.
5. Timelines and delivery
The announced timelines are indicative and start upon receipt of:
- The deposit
- The complete brief
- All necessary elements (content, access, etc.)
Any delay in the provision of elements by the client results in a proportional postponement of the delivery time.
6. Revisions and changes
Each service includes:
- MCP audit: 1 round of questions and clarifications on the deliverable
- Migration sprint: 2 rounds of revisions
- Production MCP server: 3 rounds of revisions
Beyond that, revisions are billed at an hourly rate of EUR 80.
Substantial changes to the scope are subject to a pricing amendment.
7. Intellectual property
Once full payment has been received:
- The source code belongs to you (open license, no lock-in)
- You have all rights to use, modify and exploit
- Accura.dev reserves the right to present the project in a portfolio (unless otherwise contractually stated)
8. Warranties and maintenance
8.1 Conformity warranty
30-day warranty after delivery for any non-conformity with the agreed scope. For a migration sprint, the warranty covers conformity with the specification revision named in the contract.
8.2 Bug fixing
Confirmed bugs are fixed free of charge for:
- Migration sprint: 30 days
- Production MCP server: 90 days
8.3 Maintenance and monitoring
Beyond the warranty period, compliance monitoring is offered as a monthly subscription. Since the protocol evolves through an RFC process, no engagement can guarantee permanent conformity without continuous follow-up.
9. Infrastructure and hosting
Unless stated otherwise in the quote:
- The MCP server is deployed on your own infrastructure and your own accounts
- Hosting, domain and third-party service costs remain your responsibility
- Accura.dev does not host your MCP server and does not operate it
Acceptance into a third-party connector directory, in particular Anthropic's, is that vendor's decision. Accura.dev prepares and submits the package in line with the applicable policy, but cannot contractually guarantee acceptance.
10. Liability
Accura.dev cannot be held responsible for:
- Content provided by the client (texts, images, legal compliance)
- Service interruptions due to third-party hosting providers
- Indirect damages (loss of revenue, etc.)
- Use of the site/application by the client after delivery
Accura.dev's liability is limited to the amount paid for the service concerned.
11. Cancellation and termination
11.1 By the client
In the event of cancellation by the client:
- Before start: 30% retention (administrative fees)
- During the project: payment proportional to the work performed
11.2 By Accura.dev
Accura.dev may terminate the contract in the event of:
- Non-payment after formal notice
- Serious breach by the client of their obligations
- Force majeure
12. Right of withdrawal
In accordance with Article L221-28 of the French Consumer Code, the right of withdrawal cannot be exercised for services fully performed before the end of the withdrawal period and whose performance began with the consumer's agreement.
13. Data protection
The data collected is processed in accordance with the GDPR. For more information, see our Privacy Policy.
14. Applicable law and disputes
These T&Cs are governed by French law.
In the event of a dispute, we favor an amicable resolution. Failing that, the French courts shall have exclusive jurisdiction.
In accordance with the regulations, you may resort to consumer mediation: Mediation Platform
15. Contact
For any questions regarding these T&Cs: dany@accura.dev
Last updated: August 2026
